North Shore Hubbard Lake Park is a multiphased project that is broken down into two phases (Phase I and Phase II).

 

 

Phase I is the work associated with boat launch upgrades. Some of the major components considered with this work are the following:
  • Parking Lot Expansion
  • Erosion Repairs At Existing Boat Ramp
  • 2 New Docks To Launch Boats Including One That meets ADA Requirements
  • ADA Unisex Vault Bathroom
  • 5' Wide Accessible Route
  • Burying Overhead Power Lines
  • Increases Lighting
  • Navigational Beacon
  • Demolish Existing Bathroom

Phase II is future work associated with the park facility. Some of the major components of this phase would include:

  • Two Pavilions
  • Volleyball Court
  • ADA Bathroom/Changing Room
  • Parking Lot Expansion
  • Shoreline Protection
  • Playground
  • ADA Accessible Route
  • Park Entrance Sign
  • Park Amenities